top of page

East Oakland Bicycle Corridor

69th Ave Study
Oakland, CA

A planning and visualization study developing a bicycle corridor connecting International Boulevard and the Coliseum BART Station, facilitating the growing usage of the multi-modal transit hub.

© 2021 by Prescott Reavis

    • LinkedIn
    • Instagram
    • Facebook
    • Twitter
    • Google+
    bottom of page